Implementation strategy: comprehensively consider the development of the industry, enterprise development, national and international standards, combined with the actual situation of products, processes and other enterprises, the combination of recent use and long-term planning, the service will be divided into four stages:
Phase 1: Planning
Open a trade union and determine the scope of work. Key issues for projects such as schedules, deliverables, and implementation strategies.
Formulate the total needs of the owners
Target decomposition, according to ISA-S95 standard and architecture
Analysis of key parameters, quality attributes, and major aspects of risk
Information system, intelligent system planning;
The second stage: program design
Determine the following program design priorities:
Network architecture
Enterprise layer architecture
Domain architecture (network security)
Executive layer architecture (electronic data processing and business management)
Special test unit automation
Self-control of non-special units
Historical data capture and reporting
Management software positioning
Data capture system positioning
Prepare user requirements URS
Compilation of functional requirements FS
System impact assessment
15% cost estimate and approval
The third stage: detailed design
Establish supplier evaluation form and supplier list
Designed according to the system and network architecture designed by the scheme, the system has the following systems:
Process Automation (DCS)
SIS (Safety Automatic Control System)
Such as manufacturing execution system MES
EBR (Electronic Batch Record)
Enterprise Resource Management System ERP
Laboratory Information Management System LIMS
Laboratory electronic data management system ELN,
Building control system BMS,
Environmental monitoring system EMS,
WMS (Warehouse Management System)
Data Acquisition and Monitoring System SCADA
APP terminal
Network architecture, network security, cabling
Software description
Hardware description
Configuration instructions
Design confirmation
Quality plan review
The fourth stage: land layout, construction, and verification
Territorial deployment plan
Construction plan test plan
IQ/OQ/PQ implementation
Online debugging
acceptance